Custom software development firm, UKSoftware you own.

We build software for UK businesses that have outgrown their tools. Projects from £10,000. All IP assigned to you. See prices

Most firms ask you to book a call to find out whether you can afford them. We publish every price instead, so you can qualify us before you spend an hour.

Minimum build engagement£10K
IP assigned to you on final payment100%
Free first call, no proposal attached45MIN

Every price published

Building plans with a drill and tape measureWhat it costs
Discovery and scoping£3,000-£8,000

One to two weeks. Requirements, a technical approach and a costed plan. The plan is yours, including the right to take it to another supplier.

Small system£10,000-£25,000

Four to eight weeks. One focused system: job tracking, a booking portal, a quoting tool.

Mid-size platform£25,000-£70,000

Eight to twenty weeks. Several connected modules and integrations with the systems you already run.

Large or core system£70,000-£200,000+

Twenty weeks or more. The system your business runs on, built in reviewable phases at a fixed price per phase.

Support retainerFrom £800/mo

Defined response times. Optional: you hold the code, so you can take it in-house instead.

Whiteboard with a week-by-week project plan and sticky notesHow long it takes
Integrations only (2-4)6-12 weeks

Integrations with systems you do not control are the single biggest cause of timelines stretching.

Agentic AI feasibility2-3 weeks

Proves whether an agent can do the job on your real data before anyone commits to a build.

Agentic AI production agent6-8 weeks

From an approved feasibility study to an agent running in production with audit and escalation.

What extends a timeline3 things

Integrations with systems you do not control, data quality discovered late, and how many people must approve decisions. The last one is entirely within your control.

ITJobsWatch reports a median advertised UK contractor day rate of £525 for software developers in the six months to 1 October 2026, with London 15-30% higher. Divide any quote by weeks, then by five, to see the day rate it implies. Try the cost calculator

Stop paying rent on your own operations

£81,000

Licences: 30 users at £45/month for five years. You own nothing at the end.

£45,000

A custom build. It is yours at the end.

Break-even after about 2 years 9 monthsBuild vs buy, in full

Where we are most useful

Operations-heavy businesses with physical processes, real stock or document-heavy workflows. Typically 10-250 staff.

  • Engineer working at a bench in a parts workshop

    Manufacturing and wholesale

    Stock across locations, production steps, batch traceability, pricing models no product represents.

  • Stacked shipping containers in a logistics yard

    Logistics and distribution

    Delivery reconciliation, exception handling, customer status enquiries.

  • Construction crane above a building under construction

    Construction and trades

    Job tracking, subcontractor management, compliance documentation.

  • Person working across two desktop monitors

    Professional services

    Practice management, time recording, client portals, document workflow.

  • Signed letter on a clipboard on a desk

    Healthcare administration

    Booking, records workflow, UK GDPR designed in from the start.

How we
work

Payment is tied to accepted deliverables, never elapsed time. You can stop after any phase with working software and no penalty.

The full process, week by week
Week 0
01

Free 45-minute call

What the problem costs now, what building would be worth, and the honest range. You leave with a number, not a brochure.

Weeks 1-2
02

Discovery you own

£3,000-£8,000 for requirements, a technical approach and a costed plan. Take it to another supplier if you like.

Build
03

Reviewable stages

Fixed price per phase. Working software at the end of each stage. When our estimate is wrong, that is our cost.

Handover
04

Everything in your name

Source code, documentation, deployment instructions and infrastructure in your accounts. All IP assigns on final payment.

After
05

Retainer or in-house

Support from £800/month with defined response times, or take it in-house. The documentation is written for that.

Why UK delivery

Offshore is cheaper per day, roughly £150-£350 against a UK median of £525. The day rate is also the only cost that appears on the invoice.

UK developer£525/day median

Specified, managed and reviewed in your timezone

Offshore developer£150-£350/day

Invoice
  • Your specification time
  • Your management time
  • Timezone latency
  • Rework from misunderstanding

Real gap: 30-40%

Bar lengths are illustrative. The full arithmetic

Questions for
any supplier

Including us. The answers vary more than you would expect, and they are checkable.

The full selection process →

“Do I own the source code outright, and when does it transfer?”

Under UK law an agency owns copyright unless the contract assigns it. Paying the invoice does not transfer it.

“Where will the system run?”

Your accounts, or theirs? The second is a dependency no clause removes.

“What is your day rate?”

Divide the quote by weeks, then by five. Far below £400 or far above £900 both warrant a question.

“What happens when your estimate is wrong?”

Listen for a mechanism, not a reassurance.

“Can I take your discovery document elsewhere?”

If not, it is a hostage rather than a deliverable.

“Could another firm pick this up without you?”

How comfortably they answer tells you how the handover was designed.

Hands typing code on a laptop
Two people shaking hands across a desk
Signed letter on a clipboard on a desk

Questions

What is a custom software development company?

A firm that builds software for one organisation, designed around how that organisation works, rather than selling a ready-made product. The work covers deciding what to build, building it, connecting it to existing systems, and handing it over with the source code and documentation.

What does a software development firm do?

Four things: establishes what needs building, builds it, integrates it with the systems you already run, and hands it over so you can maintain or move it. Integration is usually the largest portion of the work.

How much does custom software development cost in the UK?

Most projects land between £15,000 and £120,000, with small systems from £10,000 and core business systems from £70,000. Full ranges are published on our pricing page.

How long does a project take?

A small system takes four to eight weeks. A mid-size platform takes eight to twenty weeks. A core system takes twenty weeks or more. Discovery takes one to two weeks and happens before any build estimate is credible.

Do I own the software you build?

Yes. All intellectual property assigns to you on final payment — source code, documentation, designs and infrastructure configuration. Everything runs in your accounts on your keys.

Do you offshore the work?

No. Development is UK-based. Offshore development is a legitimate option at £150–£250/day, and we will say so when it suits your situation better, but it is not what we provide.

What if we need changes after launch?

Either a support retainer from £800/month with defined response times, or ad-hoc work quoted per change. You are not locked into either, because you hold the code.

Can you work with our existing systems?

Usually. Most projects involve connecting to accounting, CRM, stock or supplier systems already in place. We test the integration during discovery rather than assuming it will work, because this is the most common source of overruns.

What happens if you go out of business?

You hold the source code, the documentation and the deployment instructions, and the system runs on infrastructure in your name. Another firm can pick it up. This is a fair question to ask every supplier, and the answer should never be "we host it".

Do you work with startups?

Yes, where there is a defined problem and a budget from £10,000. We are less useful to pre-funding founders looking for a technical co-founder or build-for-equity.